AMBRO’s team oversees the design, engineering, and construction management of land development, municipal, residential and commercial sites, roadway, water and sanitary sewer, stormwater management, environmental assessment report, remediation plan, land development and solid waste management projects. two engineer power and energy

Waste

Specialties: Permit application, permit renewal application, construction management, groundwater monitoring, operation and maintenance manual, contingency planning, tipping and sorting area design and volumetric capacity tracking

AMBRO is working with the Miami-Dade County Solid Waste Department on upgrading numerous transfer stations. Senior leadership at AMBRO participated in the Miami-Dade County Solid Waste District Study by coordinating the work of the waste generation data gathering survey personnel. The purpose of the survey was to obtain or verify data required to calculate waste generation factors for various land uses.

For Opa Locka Recycling and Big Apple, which are solid waste facilities, AMBRO prepared construction drawings for the drainage and for site work scheduling. The stormwater management system consisted of a perimeter dry retention system capable to collect and dispose of the 25-year 3-day zero discharge storm events.

For Lofra Recyling, our skilled team worked on the design of the concrete slab, foundation and special supports for the recycling plant’s crusher and three level vibrating screens. AMBRO has also been involved in the permitting of the Materials Reduction Facility (MRF) for Big Apple Demolition, Atlas-Homestead Landfill, World Waste, WSI, Progressive Waste Solutions, Okeechobee Transfer, Certosa, Lopefra Lake Fill and A.B. Martin Transfer Station.

Case Studies

World Waste Services: Solid Waste Facilities Permitting and administration

AMBRO was responsible for the site assessment, planning, site development, solid waste permitting for Material Recovery Facilities and construction and demolition debris landfills. It is responsible for providing monthly reports, reviews and maintains scheduling of semi-annual groundwater monitoring, updates financial assurance documentation, coordinates with regulatory agencies such as Florida Department of Environmental Protection, Miami-Dade County Department of Environmental Resources Management, and South Florida Water Management District.

WSI/Progressive Waste Solutions – Opa Locka: Opa-Locka Recycling and Transfer Station

AMBRO did the design and permitting of several construction and demolition debris recycling center. The services included the preparation of Operation and Maintenance manual and Engineering Report, the design and construction management services for the facilities concrete reinforced structure, tipping slab, push wall, weighing scale and dry retention stormwater management area.