Water Main Extension on NW 90th Street

Overview

The 8” Watermain Extension on NW 90th Street East of NW 114th Avenue for the City of Doral was part of a civil engineering and construction engineering inspection (CEI) project supporting a new building addition at Toni Bilbao Preparatory Academy Middle School.

AMBRO designed approximately 2,000 linear feet of 8-inch ductile iron piping to meet fire protection and water supply needs.

The scope included new fire hydrants, service connections, and alignment through the eastern boundary of the school property to tie into an existing 12-inch main on NW 88th Street.

AMBRO also handled permitting, construction inspection, and final certification of the completed system.